Spraying and cooling tunnel
It is necessary equipment in beverage production. Such as tea, juice, energy drinks, milk, etc., This machine is mainly used in tea beverage, hot filling and carbonated beverage production line, which can increase or decrease the temperature of beverage products according to different processes technology. Spraying time setting from 10 to 45 minutes and temperature can be adjusted also according to different product.
Feature
Spray water in the first area is provided by the first section of the water tank, the water flow into the first section of the water tank, and this constant cycle of use. Heating method using coil type steam pipeline. This section is the thermal insulation section (holding time 8 minutes).
Second spray water in the area is provided by second sections of water tank, the water flow into the second section of the water tank. At the same time the second section of the water tank provided by the customer's circulating pump to pump cooling tower for cooling.
The third region of the spray water by cooling tower cooling water spray, spray water into the water tank of the third paragraph of. Water cooling tower water is provided by customers of circulating pump into the water tank of the third paragraph of. The third paragraph of the water tank with high cross flow and meets high flows into a water tank in the second paragraph.
Fourth regional spray water provided by the customer RO water spray, spray after the water into the third section of the tank.
Product List
Model | PLJ-100 | PLJ-150 | PLJ-200 | PLJ-250 | PLJ-300 | PLJ-400 |
Capacity (500ml bottle) | 6000BPH | 9000BPH | 12000BPH | 15000BPH | 18000BPH | 24000BPH |
Main motor power (KW) | 0.75 | 0.75 | 1.1 | 1.5 | 2.2 | 3.0 |
Total power (KW) | 10.45 | 13.25 | 17.6 | 22 | 33.7 | 45 |
Dimension (M) | 7*1.65*1.65 | 9*1.65*1.65 | 10*2.2*1.65 | 12*2.2*1.65 | 16*2.2*1.65 | 18*2.2*1.65 |